Newman Homes works as a commercial contractor for multi-family buildings in Central Maine: duplexes, quadplexes, apartment buildings and big old houses converted into legal units. Most of them belong to the landlord or investor who will rent them out.
- 25+ years in construction, building as Newman Homes since 2017
- Over 200 projects completed in Central Maine
- Affordable work, two-year written warranty
Newman Homes takes on multi-family construction in Augusta and Waterville: duplexes, quadplexes, apartment buildings, and conversions of big old single-family houses into legal units.
Most of this work is owned by a landlord or an investor rather than the family living in it, and the difference that actually matters is schedule. A house that runs two weeks long is an inconvenience. A quadplex that runs two weeks long is two weeks of rent that never arrives on four doors.
That is why this page is about schedule certainty rather than a per-door rate. A conversion and a new build on an open lot are different products, so there is no published band here, and the page says so instead of inventing one.
What Commercial Contracting Services Do We Offer?
Our commercial contracting is multi-family work and nothing else: buildings where people live, two or more units at a time. One itemized contract holds every trade, and one company answers for the occupancy date.
What we do not take is storefronts, office or retail fit-ups, roofs or additions for businesses, and public or bonded work. Saying so up front is worth more to you than a bid on work outside what we build.
- New duplexes, quadplexes and apartment buildings. From a second unit on an existing lot to a phased development with shared mechanical systems, built so early units can rent while later ones finish. Our Augusta and Waterville pages cover this work in detail.
- Conversions of big old houses into legal units. A large Victorian or farmhouse turned into two, three or four apartments is as much a code exercise as a construction one. Rated separations between units, independent egress and a new electrical service are where the risk sits, so they get priced first.
- Permitting and code compliance. Joe, our office manager, files the permits with the town code office, and multi-family plans also go through State Fire Marshal plan review. Accessible units are planned from the first sketch, since retrofitting them costs more.

What Do Homeowners Say About Newman Homes?
Read more reviews- ★★★★★
Great company to work with. Very communicative and quick with the work.
Michael M. - ★★★★★
I was very impressed with the promptness and professional completion of the job. I have no complaints. Great company.
Marcia A. - ★★★★★
Brandon was always very fair with any adjustments to our fixed price contract, and we were quite happy with the outcome.
David K.
How Much Does Multi-Family Construction Cost?
Multi-family construction is priced per project after a walkthrough, because a conversion and a new build differ too much for an average to mean anything. We publish price bands for residential work, where projects repeat often enough to produce a useful average.
A three-unit conversion of an 1890s house has little in common with a new quadplex on an open lot. One figure covering both would mislead you, so there is no published band here.
What you do get is our residential contract structure: each trade on its own line, and every unknown carrying a written allowance with a unit price. Per-unit cost also falls as the unit count rises, because site work and mobilization spread across more doors.
What Other Contractor Services Do We Offer?
Which Building Code Applies to an Apartment Building?
A building with three or more units falls under the commercial side of the Maine Uniform Building and Energy Code, while a duplex usually stays on the residential side. Occupancy classification drives much of what the design has to do, from egress to fire separation.
A conversion is where that matters most, because a house built under one set of rules now has to meet another. We answer the occupancy question before design gets expensive.
Why Is Accessibility a Real Scope Item?
Accessibility is a real scope item because new apartment buildings of four or more units carry federal accessible-design requirements for their ground-floor units. The State Fire Marshal's plan review checks barrier-free compliance as well.
It is far cheaper designed in than found at the final inspection. We price it at the walkthrough so it never arrives as a surprise.
Why Does a Multi-Family Schedule Cost Money?
A multi-family schedule costs money because an unfinished unit earns nothing while the construction loan keeps charging interest. Staged occupancy costs more to organize and less in lost rent, and that trade is yours to make.
We lay out both options before the contract rather than after. Your lender will usually specify insurance limits too, and we provide certificates at whatever level the loan requires.
What Is Our Commercial Contracting Process?
Walkthrough with whoever is paying.
Owner, lender or both attend, so the scope reflects the real constraint. Code, occupancy, accessibility and egress questions get answered before design gets expensive.
An itemized contract with the schedule attached.
Milestones you can plan a lease-up around, then Joe files the permits and we coordinate the state review. The code authority decides what gets approved, and we plan around its timeline.
Build, phase, inspect and turn over.
If tenants already live in part of the building we phase the work around them, with progress photos twice a week and same-day calls. Final inspection and a written punch list come next, then 2 years of workmanship coverage.
Why Do Property Owners Hire Newman Homes?
Property owners hire us because we publish a completion rate and put the schedule in the contract. A house that runs two weeks long is an inconvenience, while a fourplex that runs two weeks long is two weeks of rent missing on four doors.
Each of us has a defined job on a multi-family project. Brandon reviews every set of plans, Elijah prices the work and runs the site, and Joe files the permits with the town code office.
Brandon Roberge founded the company in Augusta in 2017, and his 25+ years of building run across three states. Since then we have finished 200+ projects.
Measured monthly, 94% of our projects finish on the original schedule and budget. On a rental building that figure matters more than on a house, because the rent starts on the day we hand over the keys.

What Should You Ask a Commercial Contractor Before You Sign?
Ask a commercial contractor for everything in writing, because Maine has no state licensing standard for general contractors, commercial or residential. That surprises investors more than homeowners, and it means the agreement has to do the work.
These three belong in any multi-family contract.
Trade by trade and building by building, with allowances priced by the unit. Where the work qualifies as residential construction, it should be structured under Maine's home construction contract law.
Including what happens to those dates if the Fire Marshal's review runs long.
Certificates at your lender's limits, a written workmanship warranty (ours is 2 years, backed by an A+ BBB profile) and the licensed electricians and plumbers named.
What Do Property Owners Ask Before Hiring Us?
We can phase the job so occupied units stay habitable and egress stays legal the whole way through. It costs more in labor and less in lost rent, and that trade is yours to make.
We do not build storefronts, office or retail fit-ups, or roofs and additions for businesses. Our commercial work is multi-family only, and we would rather say so than bid work we don't do.
We take duplexes through small apartment buildings, including phased developments of a few buildings on one parcel. If a project is bigger than we should be running, we will tell you at the walkthrough.

How Do You Start a Commercial Project With Us?
Call (207) 480-7700. Someone answers around the clock, usually the owner.
Or write [email protected] with the address and the unit count you have in mind. You can also request a free estimate.