Kitchen remodeling: cream shaker cabinets, white subway tile, a gray quartz peninsula, farmhouse sink under the window and a gas range

Local Kitchen Remodeling | Newman Homes

Kitchen remodeling is the project homeowners research longest, and almost nobody in this market publishes a real number for it. We publish five price bands on this page, so you can tell in under a minute whether the kitchen you have in mind fits your budget.

  • 25+ years in construction, building as Newman Homes since 2017
  • Over 200 projects completed in Central Maine
  • Affordable work, two-year written warranty

What a kitchen remodel costs with Newman Homes in Central Maine, sorted into five bands from a cosmetic refresh up to a full layout change with a wall taken out.

There is no price per square foot on this page and there will not be one. Kitchen cost is driven by cabinet run, appliance count, and how much plumbing and electrical has to move. None of those scale with floor area, so a per-foot number would be a guess dressed up as a rate.

The number to leave with is the floor: $28,000. Below that you are looking at a partial update rather than a kitchen remodel, and Newman Homes would rather say so than write a price it cannot build to.

What Kitchen Remodeling Services Do We Offer?

We offer complete kitchen remodels, from a cosmetic refresh to a full layout change, with one builder responsible for every trade in the room. Most projects come down to three kinds of work.

  • Custom and semi-custom cabinets. Cabinets are the single biggest line and the main thing you control. Stock, semi-custom and custom is a real ladder, and moving up one rung changes the total more than any counter material will.
  • Countertops, backsplash and flooring. Quartz, granite, laminate or butcher block, templated after the cabinets are set, with tile and flooring laid over a subfloor we've checked first.
  • Layout changes with plumbing and electrical moved. Islands, opened walls on a sized beam, relocated sinks and ranges, and the dedicated circuits a modern kitchen needs.
Kitchen remodeler Central Maine: light gray shaker cabinets with a blue hex tile backsplash, nearly finished

What Do Homeowners Say About Newman Homes?

Read more reviews
  • ★★★★★

    We were very pleased with the extensive home remodel we contracted with Newman Homes. Brandon was always very fair with any adjustments to our fixed price contract, and we were quite happy with the outcome.

    David K.
  • ★★★★★

    …found Brandon to be knowledgeable, responsive, and professional. We highly recommend Newman Homes and plan to use them in the future.

    Dawn R.
  • ★★★★★

    Great company to work with. Very communicative and quick with the work.

    Michael M.

How Much Does a Kitchen Remodel Cost?

A kitchen remodel with Newman Homes costs $28,000 at the floor and $85,000 to $105,000 for a full layout change, with three bands in between. Real kitchens land near a band, rarely right on one.

ScopeRange
Cosmetic refresh, layout unchanged. Refaced or stock cabinets, new counters, sink, backsplash, floor, lighting$28,000 floor
Standard gut. Semi-custom cabinets, quartz counters, new flooring and lighting, sink and range stay put$46,000 to $58,000
Gut plus plumbing moved, no wall removed$60,000 to $80,000
Layout change. Wall out with a beam, sink or range moved, island added with power$85,000 to $105,000
Custom cabinetry and stone counters on top of a layout changeadd $15,000 to $25,000

Each figure is a qualifying range averaged across hundreds of our estimates, not a quote for your kitchen. The $28,000 floor is firm, because below it you're buying a partial update rather than a remodel. There is no kitchen price per square foot, and we won't publish one. Cabinet run, appliance count and how much plumbing or electrical moves drive the cost, and none of those scale with floor area. Our kitchen cost guide explains all five bands in detail.

What Other Services Do We Offer?

Kitchen remodeler Central Maine: quartz counter being templated in a Maine kitchen renovation

How Does Our Kitchen Remodeling Process Work?

  1. We measure, look underneath and design.

    Elijah, our estimator and site foreman, checks the panel, the plumbing, the floor level and what sits above any wall you want opened. Layout comes first, then cabinet tier, following published kitchen design standards.

  2. You sign an itemized, fixed-price contract.

    Cabinets, counters, appliances, plumbing, electrical, flooring and named allowances each sit on their own line. Anything structural is sized before the price is final.

  3. We build in the right order and finish to zero.

    Structure first, then rough mechanicals and inspection, then cabinets, counters, tile and trim, with photos twice a week. A written punch list gets worked to zero, and 2 years of workmanship warranty follow.

What Changes the Price of a Kitchen Remodel?

Three things move a kitchen number more than anything else once demolition starts, and we check all three before we price. The first is whether the sink and range stay put, because moving plumbing and gas is the expensive change and moving cabinets is not.

The second is whether the wall someone wants gone carries the floor above it. A structural opening needs a beam, posts and a load path to the foundation, and that is the jump from the $60,000 band to the $85,000 one.

The third is what the electrical service can support. A modern kitchen needs dedicated circuits, and pre-1960 houses around here routinely still have knob-and-tube wiring and an undersized panel.

Older houses add their own list: out-of-level floors, layered flooring with lead or asbestos under it, and subfloor rot at the sink wall. On rural lots we also check well water chemistry and whether the septic can take a new dishwasher and disposal.

Newman Homes has worked out of Augusta since 2017 under Brandon Roberge, who brings 25+ years in the trade across Florida, Massachusetts and Maine.

Recounted monthly, 94% of our projects finish on the original schedule at the original number.

Kitchen remodeling contractor Central Maine: load-bearing wall opened with a beam between a kitchen and dining room

How to Hire a Kitchen Remodeling Contractor

Maine has no state licensing standard for general contractors or builders, so a remodeler's credentials are whatever he or she puts in writing. Electrical and plumbing work is different: those trades carry state credentials, and the people doing yours should hold them.

Ask for these three things in writing before you sign anyone's contract.

A tier alone isn't a specification, and the counter and appliance allowances should be named with real numbers.

Frequently Asked Questions About Remodeling a Kitchen

You'll be without a working kitchen for three to five weeks on most projects, and we set up a temporary one before demolition. The whole job runs four to ten weeks depending on the band, and cabinet lead time is usually the longest single item.

Kitchen remodeling contractor Central Maine: finished kitchen, wide interior view

Ready to Start Your Kitchen Remodel?

Call (207) 480-7700. Someone answers around the clock, most often Brandon.

Or write to [email protected], or request a free estimate.