
Skilled General Contractor in Belgrade, ME
- Newman Homes is the general contractor Belgrade, ME owners call when a lake property needs real construction rather than another season of patching.
- Our shop is in Augusta, about twenty minutes out, and we have worked the Belgrade Lakes chain since 2017. Brandon Roberge built custom homes in Florida and Massachusetts before bringing that work to Kennebec County, and his 25+ years of building span all three states.
- Ninety-four percent of what we build finishes on the original timeline and budget. That number is recounted monthly, camp conversions included.

- 25+ years in construction, building as Newman Homes since 2017
- Over 200 projects completed in Central Maine
- Affordable work, two-year written warranty
General contracting in Belgrade, Maine, about twenty minutes from the Augusta shop, covering the village and the whole Belgrade Lakes chain.
Lake properties generate a particular kind of project: the year-round conversion. Heating a building that was built for July, insulating walls that have none, and adding the space that makes it work in February. That is general contracting rather than a single trade.
Access and season both matter more here. Camp roads limit what can be delivered, and the useful working window is shorter than the calendar suggests. Additions run $280 to $400 a square foot turnkey.
What General Contracting Services Do We Offer in Belgrade?
General contracting in Belgrade is mostly the year-round conversion: heating a building that was built for July and adding the space that makes it work in February. That is several trades and a foundation question, which is why it belongs under one contract.
Year-round conversions and additions. Attached garages on the uphill side, kitchens, bathrooms, great rooms opened toward the water, sun rooms and porches. Nearly every one starts with whether what sits under the camp can carry a heated room.
Foundation and structural work. Camps on old piers get a proper foundation before a four-season room goes on top, and light-framed walls get new headers and posts designed as one system. It is the most common mistake we get called in to fix.
Permitting on the shoreland. Joe prepares the scaled site plan the town requires, and the shoreland rules shape the schedule more than any other factor. We settle both before we promise a start date.
What Do Homeowners Say About Newman Homes?
Read more reviews- ★★★★★
Brandon was always very fair with any adjustments to our fixed price contract, and we were quite happy with the outcome.
David K.remodeling client - ★★★★★
I was very impressed with the promptness and professional completion of the job. I have no complaints. Great company.
Marcia A. - ★★★★★
Great company to work with. Very communicative and quick with the work.
Michael M.
Get your free estimate request sent in 60 seconds
Answer a few quick questions about your Belgrade project. No pressure, no obligation, just a straight answer on cost and timeline.
What Other Contractor Services Do We Offer in Belgrade?

Where Do We Build Around Belgrade?
We build in Belgrade Lakes village, along the Great Pond and Long Pond shorelines, on the Messalonskee side and on the roads out toward Sidney and Vienna. Shoreland zoning governs most waterfront work on the chain.
Camp roads are narrow and often privately maintained. Truck size and crane placement get planned before the schedule is promised, and near the shoreline erosion control goes in before the excavator does.

When Should You Book Belgrade Work?
Book four to twelve weeks ahead, and add time if shoreland review applies. The permit goes through Belgrade Code Enforcement, which wants a site plan drawn to scale with the application.
Access is best from late spring through fall, and that window fills first. Interior work on a conversion carries through the winter once the building is closed in.

Why Belgrade Residents Hire Us for an Addition
Belgrade residents hire us because we look under the building before we price it. Camp conversions are the classic place for a low bid to fall apart, since the foundation problem sits where nobody checked.
We keep score on that promise: 94 percent on the original timeline and budget across 200+ projects since 2017, tracked monthly. If something real changes, it becomes a written change order you approve first.
Finished work carries a 2-year workmanship warranty, and we hold an A+ rating on our BBB profile.
Who Calls Us in Belgrade?
Mostly people who inherited or bought a camp and now want to live in it call us. Great Pond, Long Pond, Messalonskee, Salmon Lake, McGrath Pond and North Pond bring different water but the same building problem.
These structures were built to be closed in October. Making one work in February is a different building, and we would rather tell you that at the estimate than discover it with you in November.

How Much Does an Addition Cost in Belgrade?
An addition in Belgrade runs from about $280 per square foot at the entry end to roughly $320 on an average job, and higher-end finishes reach $350 to $400. Think of those as averages drawn from hundreds of quotes, a range for qualifying your budget rather than a price for your camp.
Camp conversions frequently sit above the average, because you are buying a foundation, an envelope and mechanical systems the building never had. The three things that move a Belgrade budget:
We assess the building before quoting and hand you a breakdown by trade, so you can decide what happens now and what waits. New builds are covered in our Maine home building cost guide.

Shoreland permitting.
Setbacks and review can reshape the footprint and add weeks before anything is built.
Narrow access.
Private camp roads limit truck size, which changes how concrete and lumber arrive.
Winterizing the existing structure.
Insulation, heat and a real foundation under the old part often cost as much attention as the new part.
How to Hire a General Contractor Belgrade, ME
Start with a fact lake-country builders rarely volunteer: Maine has no state licensing standard for general contractors or builders. Electricians and plumbers carry state credentials, and builders carry a contract, so the contract deserves your full attention.
Ask for these three before you sign.
Under Maine's home construction contract statute, the first check you write can't exceed one third of the contract.
Certificates for the builder and each subcontractor, delivered to you before anyone works near the shoreline.
Ask what the camp sits on now and what a heated room will sit on. A builder who has not looked cannot answer.
Which Towns near Belgrade Do We Serve?
See our full service areaWhere Is Our Shop?
Directions from Belgrade, ME to our shop in Augusta
125 Community DrAugusta, ME 04330-8156

What Is Our General Contracting Process in Belgrade?
- We start on your lot, not in an inbox.Belgrade camp roads are narrow and equipment access is a real estimate line, so Elijah sizes it up before pricing. The contract names every trade, allowance and unit rate, and the first payment stays at or under the one third Maine law allows.
- We file, the town decides, the crews follow in order.Joe files the permit and the scaled site plan, and we build the calendar around the code officer's timeline. Site work, foundation, framing, roof and close-in then run one after another, with photos twice a week so you do not have to drive out.
- You see every change before you pay for it.Change orders are written and signed first, never found on a final bill. Brandon walks the finished job, the punch list goes to zero, and 2 years of workmanship coverage start.

How Do You Start a Belgrade Project?
Call (207) 480-7700. Brandon usually answers, and the line is covered at any hour.
Email [email protected] with the property address and a short description, or request an estimate.



